Commercial Projects: Test Fits, Tenant Buildouts, Offices & Churches

Questions from business owners, tenants and building committees about leasing, building out and renovating commercial and worship space in Southwest Florida.

Ask Us Your Question

Shown: Tuscola Commons, North Port

Reviewed November 17, 2026 by Ted Sottong, AIA. General information for property owners in Lee and Collier County; requirements vary by jurisdiction and property, so talk with us about your specific project.

What is a test fit, and why do it before buying or signing a lease?

A test fit is a quick, scaled study of your project on a specific site or in a specific space. It shows whether the building and parking appear to fit the land, or whether your layout fits the space, and what zoning or code issues may come with it, while you can still negotiate or choose a different property.

How much does a test fit usually cost compared with the lease risk it removes?

A test fit is a small piece of work. A lease or a land purchase is a multi-year commitment, often with buildout costs on top. Checking the fit before you commit is typically a small cost relative to the lease.

We quote test fits individually based on the size of the space.

What does a tenant buildout (tenant improvement) permit need?

The reviewer looks at how the space is classified (occupancy), how many people it holds, exits (egress), accessibility (ADA and the Florida accessibility code), fire protection, and the mechanical, electrical and plumbing work.

The drawings need to address each one.

Does changing a space's use change code requirements?

Yes, it can. Moving from one use to another, for example retail to restaurant or office to daycare, can change the requirements for exits, restrooms, fire protection, parking and zoning approval.

This is the most common surprise in a lease, and the reason to check before signing.

What's different about designing a church?

A church is an assembly building, with stricter rules for exits and fire protection. Parking is usually tied to seating, acoustics shape the room, and most churches build in phases as fundraising allows.

The design has to work for all of that.

Can a church build in phases, and how do we plan it?

Yes. Start with a master plan for the whole site, then design each phase to stand on its own. Sizing utilities, drainage and parking for the final campus up front can help avoid rebuilding them later.

What do office renovations need to stay code-compliant while we're still operating?

Exits, fire alarms and sprinklers, and accessible routes must stay in service for occupied areas, and construction zones need to be separated from the areas in use. We plan the phasing with your contractor with the aim of keeping the building compliant and safe throughout.

How do I find out what ADA upgrades will be triggered?

Ask before you design. An accessibility review of the existing space and the planned work shows what must be upgraded, such as entries, restrooms and the path to the renovated area.

The extent depends on the scope and cost of your project.

Start with a conversation

Tell us what you're building.

+1 (239) 229-9870 · ted@arcraftstudios.com

Request a Consultation

Our clients describe the work in their own words.

Read our Google reviews