Shown: Canterbury School Press Box, Fort Myers · Arcraft Studios
Reviewed November 17, 2026 by Ted Sottong, AIA. General information for property owners in Lee and Collier County; requirements vary by jurisdiction and property, so talk with us about your specific project.
Building new in Southwest Florida means designing for wind, flood elevation and local zoning from day one. Those rules shape the building as much as your wish list does, so we bring them into the first conversation.
Ted Sottong's new construction work ranges from private homes to university, healthcare and worship buildings. The Sergent Residence in Ocala is a home built from a pre-engineered metal building. No project is too small or too large for a first meeting.
Our process
How it typically works
01
Feasibility
What the lot allows: zoning, setbacks, flood elevation, utilities.
02
Schematic design
Options on paper, in face-to-face meetings, until the plan feels right.
03
Design development
Structure, systems and materials tracked against the budget.
04
Construction documents
A set prepared for permit review and for your builder to bid and build from.
Common questions
What do I need before an architect can start?
A current boundary survey is the usual starting point. Depending on the site, you may also need a topographic survey, a soils (geotechnical) report and a zoning check. We'll tell you which ones your lot is likely to need before you spend money on them.
Who do I hire first, the architect or the contractor?
Most owners start with the architect so the project is defined before it's priced. Bringing a contractor in early for cost input can work well, and we're glad to work alongside one you already trust.
How do flood zones affect new construction?
Your flood zone sets the minimum elevation of the lowest floor and can limit how the space below it is used and built. That affects the foundation, the entry and the cost, so we check it at the start.
Is pre-engineered metal construction an option for my new building?
It can be, particularly for warehouses, shops and large open rooms. The manufacturer engineers the frame; the site plan, foundation, life-safety and accessibility review and any local design standards typically still need a licensed design professional.
Some jurisdictions limit exposed metal panels on street-facing sides.