What happens if I did work without a permit?
If the jurisdiction finds out, it can issue a violation notice and require you to get a permit for the work after the fact. That usually means drawings, inspections and fees, and sometimes corrections to the work.
It also tends to surface when you sell or insure the property, so it is worth resolving on your own schedule.
I got a stop-work order or violation notice. What are my next steps?
Stop the work, read the notice for its deadline and what it cites, and don't ignore it. Gather the notice, any permit numbers, photos and whatever drawings exist, then call a licensed professional.
We can contact the jurisdiction, find out what they need, and help map out the response.
How do I respond to a permit review comment letter?
Answer every comment, in order, in writing, and show where each change appears on the revised drawings. Partial or unclear responses are the main reason applications go around again. If a comment seems wrong, a call with the reviewer often settles it faster than a resubmittal.
Can unpermitted work be legalized with an after-the-fact permit? What does it involve?
Often, yes. It generally involves drawings of what was built, a permit application, and inspections. Inspectors may need to see concealed work such as wiring, plumbing or structure, and anything that doesn't meet code has to be corrected.
Will I need drawings for work that's already built?
Usually. The reviewer needs drawings to check the work against the code, the same as if it were new. We measure and document the existing conditions and prepare the drawings.
How long do permit reviews take, and how do we avoid resubmittals?
Review times vary by jurisdiction, project type and season. What you can control is the quality of the submittal: a complete, coordinated set that answers the reviewer's likely questions the first time.
When is a permit required for a deck, patio, interior remodel or office refresh?
As a general rule, cosmetic work such as paint and flooring doesn't need a permit, and work that touches structure, electrical, plumbing, mechanical systems, exits or the building's footprint does.
Each jurisdiction publishes its own list of what is exempt.
Who can pull the permit: owner, contractor or architect?
Typically the licensed contractor doing the work pulls the permit. Florida also allows owners to act as their own contractor in certain situations, with conditions. The architect prepares the drawings and supports the application.
What does it cost to fix permit problems versus doing it right the first time?
Fixing it later typically costs more: after-the-fact fees can be higher, finished work may need to be opened or redone, and the delay has its own cost. We can't quote a number without seeing the situation, but addressing it early typically costs less.