From signed lease to open doors, with the code questions asked early.

Design and permit drawings to turn a leased shell or second-generation space into your business.

Request a Consultation

Shown: Hammerhead Gym · Arcraft Studios

Reviewed November 17, 2026 by Ted Sottong, AIA. General information for property owners in Lee and Collier County; requirements vary by jurisdiction and property, so talk with us about your specific project.

A tenant buildout turns a leased space into a working business: walls, restrooms, exits, lighting, equipment and finishes, designed and drawn for a permit. It starts after you've chosen the space, and it runs on your lease clock.

It is different from a test fit, which happens before you sign, and from an office renovation, which updates a space you already occupy. We prepare the buildout drawings, coordinate with your landlord's requirements and your contractor, and respond to the plan reviewer's comments.

Our process

How it typically works

  1. 01

    Lease and landlord criteria

    We review the work letter, the landlord's design criteria and what the lease says you must build.

  2. 02

    Code review

    We check the use, occupancy, exits, restrooms, accessibility and fire protection for the space.

  3. 03

    Buildout drawings

    Architectural drawings coordinated with engineering, prepared for pricing and for the permit.

  4. 04

    Permit and construction support

    We respond to review comments and answer contractor questions during the work.

Common questions

What is a tenant buildout, and how is it different from a test fit?

A tenant buildout is the design and construction of a leased space for a specific tenant. A test fit comes earlier and only tests whether the space appears to work.

The buildout is the full set of drawings and the construction that follows.

What does a tenant buildout permit typically need?

Reviewers typically look at the use and occupancy of the space, the number of occupants, exits, accessibility, fire protection, and the mechanical, electrical and plumbing work. Requirements depend on the jurisdiction and on the type of business.

Does it matter what the space was used for before?

Yes, it can. If your use differs from the last approved use, for example retail becoming a restaurant, requirements for exits, restrooms, fire protection and parking can change. Checking this before or early in the lease is worthwhile.

Start with a conversation

Tell us what you're building.

+1 (239) 229-9870 · ted@arcraftstudios.com

Request a Consultation

Our clients describe the work in their own words.

Read our Google reviews