Most office renovations happen while the business is still operating. That makes planning as important as design: which areas close, when, and how people stay safe and productive in between.
We design the new layout and a sequence to build it, and we check early for the upgrades a renovation can trigger so they can be budgeted from the start.
Our process
How it typically works
01
How you work
We learn how the office runs today and what isn't working.
02
Code check
We identify what the renovation may trigger: accessibility, exits, fire and life safety.
03
Design and phasing
A layout and a construction sequence planned around your operations.
04
Permit and build
Drawings for permit and pricing, with support through construction.
Common questions
Do I need a permit for an office refresh?
Paint, flooring and furniture generally don't need a permit. Moving walls, changing electrical, plumbing or mechanical systems, or altering exits generally does. The exact line is drawn by your local building department.
Will renovating force me to upgrade for accessibility?
It can. Renovations to an area can trigger accessibility upgrades to that area and to the route that serves it. How far the upgrades go depends on the scope and cost of the work, so we check before design is final.
Can we keep operating during the work?
Usually. The work is typically planned in phases so exits, fire protection and accessible routes stay in service for the areas still in use.