Architect for Lee County's Gulf Coast Islands

Building on Captiva, Sanibel, Pine Island, Fort Myers Beach or Boca Grande is different from building on the mainland: access, flood elevation, wind, coastal rules and several layers of jurisdiction all shape the project. Arcraft Studios helps island owners plan for them from the first meeting.

Start an Island Project

Shown: Dock pavilion · Arcraft Studios

Reviewed November 17, 2026 by Ted Sottong, AIA. General information for property owners in Lee and Collier County; requirements vary by jurisdiction and property, so talk with us about your specific project.

The islands we serve

Barrier and small islands of Lee County

Captiva

Captiva is an unincorporated barrier island in Lee County, reached by road through Sanibel. Projects on Captiva are permitted through Lee County, under planning rules written for the island. Arcraft Studios does a lot of dock work here, along with renovations and storm rebuilding.

Sanibel

Sanibel is its own city, with its own planning department, land-use plan and permitting process, separate from Lee County. Projects on Sanibel are shaped by the city's environmental and development limits as well as flood and wind rules.

Pine Island (Matlacha, Bokeelia, St. James City)

Pine Island, including Matlacha, Bokeelia and St. James City, is unincorporated Lee County and is reached by a single road through Matlacha. Many lots are canal-front, and Lee County's community plan for Greater Pine Island affects what can be built.

Fort Myers Beach

Fort Myers Beach is an incorporated town on Estero Island with its own building and permitting office. Much of the work here since Hurricane Ian in 2022 involves storm rebuilding, elevation and substantial-damage rules.

Boca Grande / Gasparilla Island

Gasparilla Island is split between Lee County and Charlotte County, and the village of Boca Grande is on the Lee County side. Historic-district review and island-specific development rules can apply in addition to county permitting.

Useppa, Cabbage Key & Cayo Costa

Ferry-access islands: we also work with owners on Useppa, Cabbage Key and Cayo Costa, where there is no bridge and people, materials and equipment arrive by boat or barge.

Access & logistics

How does building on an island change the schedule and cost (barges, bridge or causeway limits, ferry-only access)?

Island work typically costs more and takes longer than the same project on the mainland in Lee County. Materials, equipment and crews have to cross a bridge or causeway, or arrive by barge or ferry on islands such as Useppa and Cayo Costa, and that travel time is built into every trade's price.

Planning deliveries, staging and crew travel early usually helps. How much it adds depends on the island and the project.

Can materials and heavy equipment reach my island lot, and how do we plan for it?

Usually, with planning. On Sanibel, Captiva, Pine Island, Fort Myers Beach and Boca Grande, loads travel by road and may be limited by bridge weight limits and narrow streets. On ferry-access islands, everything comes by barge. The design can account for this through material sizes, staging areas and construction methods.

How do bridge closures, storm evacuations and seasonal traffic affect construction schedules?

They can add delays that a mainland project would not see. Storm season, evacuation orders, bridge or causeway repairs and winter-season traffic on Sanibel, Pine Island and Fort Myers Beach all affect when crews and deliveries can reach the site, so island schedules typically include extra allowance for them.

Why do contractors price island work differently, and how should I compare bids?

Island bids usually include travel time, tolls, barge or delivery costs, and limited staging space, which mainland bids do not. To compare bids fairly, check that each contractor priced the same drawings and the same assumptions about access and logistics. A complete set of drawings makes bids easier to compare.

Permits & jurisdiction

Which jurisdiction permits my island project (City of Sanibel, Town of Fort Myers Beach, or Lee County)?

It depends on the island. Sanibel projects are permitted by the City of Sanibel, and Fort Myers Beach projects by the Town of Fort Myers Beach. Captiva, Pine Island, Matlacha and Boca Grande are in unincorporated Lee County. Part of Gasparilla Island is in Charlotte County.

What is the Coastal Construction Control Line (CCCL), and does my property fall seaward of it?

The Coastal Construction Control Line is a line set by the State of Florida along sandy Gulf beaches. Construction seaward of it typically needs a state permit in addition to local approval. Whether a specific property on Captiva, Sanibel, Fort Myers Beach or Boca Grande is seaward of the line has to be checked for that parcel.

Which state or federal approvals apply to waterfront work (DEP, Army Corps, submerged lands)?

Waterfront work such as docks, seawalls and shoreline changes can need approval from the Florida Department of Environmental Protection and the U.S. Army Corps of Engineers, and may involve state-owned submerged lands, in addition to the local permit. Which ones apply depends on the site and the work.

How long do island permits typically take, and what causes delays?

It depends on the island, the jurisdiction and how many agencies review the project. Projects that need state or federal approval, or a local design or historic review, typically take longer than a single local permit.

What local plans or community-character rules affect design on Sanibel, Captiva, Pine Island and Boca Grande?

Each island has its own rules meant to protect its character. Sanibel has its own city land-use plan, Lee County has community plans covering Captiva and Greater Pine Island, and Boca Grande has historic-district review. These can affect height, density, building size and appearance.

Flood, wind & storm recovery

How do flood zones (including V zones and coastal high hazard areas) change the foundation and elevation I need?

On the Gulf Coast islands of Lee County, most properties are in high-risk flood zones. In V zones and coastal high hazard areas, buildings generally must be elevated on piles or columns, with the space below kept open or built with breakaway walls. The required elevation depends on the flood map for your parcel.

This affects the foundation, stairs and access, equipment locations and the look of the building.

What is “substantial damage,” and how does the 50% rule affect rebuilding after a hurricane?

Substantial damage generally means the cost to restore a damaged building equals or exceeds 50% of its market value before the damage. When that happens in a flood zone, the building typically must be brought up to current flood requirements, which often means elevating it.

How value and repair costs are measured differs between Sanibel, Fort Myers Beach and Lee County, and makes a large difference to the result.

Should I renovate or rebuild a storm-damaged island home or building?

It depends on the extent of damage, the flood zone, the 50% rule and what you want the building to become. If repairs would trigger full flood compliance, rebuilding to current code is sometimes the better long-term value. A feasibility review compares both options before you commit.

How do wind-speed and impact-glazing requirements affect island design and cost?

The Florida Building Code sets high design wind speeds for the Lee County coast. Structure, roofing, windows and doors must be designed for those loads, and openings generally need impact-rated glazing or approved protection. This affects window sizes, product choices and cost.

What documents do I need after storm damage (elevation certificate, damage assessment, permit history)?

Useful documents include an elevation certificate, photos and a damage assessment, your insurance paperwork, any substantial-damage letter from the jurisdiction, a survey, and the property's permit history. Bring what you have; we can help identify what is missing.

Environment & site

How do protected habitats, mangroves, dune vegetation and sea-turtle lighting rules affect my plans?

They can limit where and how you build. Mangroves and dune vegetation are protected, and trimming or removal is regulated. Beachfront properties on Sanibel, Captiva, Fort Myers Beach and Boca Grande are typically subject to sea-turtle lighting rules that affect exterior lights and glass facing the beach.

Septic, well or central utilities on the islands: what is each project likely to need?

It varies by island and by street. Some areas have central water and sewer, and others, including parts of Pine Island and the ferry-access islands, rely on septic systems, wells or cisterns. The type of utility affects site layout, cost and approvals.

What materials hold up to salt air and humidity on the Gulf Coast?

Materials on the Gulf Coast islands are chosen for corrosion, moisture and sun. Corrosion-resistant fasteners and connectors, appropriate concrete cover, and exterior finishes rated for coastal exposure all matter. Specific product recommendations depend on how close the building is to open water.

How do setbacks, height limits and lot coverage work on small island lots?

Each jurisdiction sets its own setbacks, height limits and lot coverage, and island rules are often stricter than mainland ones. On a small lot, these limits, together with required flood elevation and septic or drainage areas, define the buildable envelope before design begins.

Docks, decks & outdoor living

What does it take to add or repair a dock, boat lift or seawall?

It typically takes a survey, a design that respects setbacks, water depth and protected resources, and permits that can involve local, state and federal agencies. Repairs within an existing footprint are often simpler than new work, but usually still need a permit.

Do decks, patios and pool areas need separate permits or elevation changes in coastal zones?

Often, yes. Decks, patios, pools and enclosures typically need their own permits or must be included in the main permit. In coastal flood zones, structures attached to an elevated building, and anything below the flood elevation, are subject to specific construction rules.

Can I rebuild a dock or deck I had before the storm?

Sometimes. Rebuilding what existed is often allowed, but it usually needs a permit, and current rules may apply to some or all of the work. Records of what was there before, such as old permits, surveys and photos, are helpful.

Commercial & community

What should I know before opening or renovating a restaurant, retail or hospitality space on an island?

Check the zoning, the flood zone, parking and the last approved use of the space before you sign. On Sanibel, Captiva, Fort Myers Beach and Boca Grande, a change of use or a large renovation can trigger flood, accessibility and fire requirements. A test fit and code review early can help you understand the scope.

Can a church or nonprofit expand or rebuild on an island lot, and what do parking and zoning require?

Possibly. It depends on the zoning, the size of the lot, parking tied to seating, and flood rules for the building. Island lots are often tight, so a site test fit is a sensible first step to see what appears feasible.

How do HOA, condo and architectural review boards affect island projects?

Many island properties fall under an HOA, condominium association or architectural review board whose approval is separate from the building permit. Their meeting schedule and rules can affect both design and timing, so it helps to prepare their submittal early.

What should I know about short-term rental rules before renovating?

Short-term rental rules differ between Sanibel, Fort Myers Beach and unincorporated Lee County, and can affect what a renovation makes sense for. Check the current rules for your property before you design around rental use.

Process

What should I bring to a first meeting for an island project (survey, elevation certificate, photos, permit history)?

Bring what you have: a survey, an elevation certificate, photos, any permit history or notices from the jurisdiction, HOA or condo documents, your goals and a budget range. You don't need everything to start; the first meeting is where we identify what is missing.

When should I hire the architect versus the contractor on an island project?

Most owners start with the architect, so the project and its flood, coastal and zoning constraints are defined before it is priced. On island projects, bringing in a contractor with island experience early, for input on access and cost, is often worthwhile.

Start with a conversation

Tell us what you're building.

+1 (239) 229-9870 · ted@arcraftstudios.com

Request a Consultation

Our clients describe the work in their own words.

Read our Google reviews